Completed in 15 months against stipulated 18 months
Project covered civil, electrical, fire-fighting, sanitary & other related works
Working Plan & Methodology was devised in such a way that no team remains idle and works with minimum resources
In-house team developed structural & other drawings
Efficient co-ordination between teams led to low overheads & faster execution
Project of RHB, Jaipur
Completed in 21 months
4 G+12 High Rise Towers
Scope: Structural, Electrical, Lifts, Fire-Fighting, Paint, Joinery, Sewer, Water & Sanitary
After project support to Flat Owners
Steel shuttering & AAC Blocks used
Setup RMC Plant at site
Project of RSRDCC
Completed in record time
Close coordination with architect for designing and other drawings
Special material used: Calcium Silicate Ceiling Tiles, Silica Sand, M-Sand, Mipolam Flooring etc.
588 Flats completed in 18 months
4 G+10 high rise towers
Scope: Structural, Electrical, Lifts, Fire-Fighting, Paint, Joinery & Sanitary
Shuttering used: Plywood, Steel Plates and Jacks - all owned
Steel: Primary 500D
AAC Blocks instead of bricks
Owned RMC Plant setup at site to ensure quality
224 G+3 2BHK Flats - 14 blocks - 16 flats each
Working Area - 30000 Sq. Mtr.
Completion Time - 18 months
Electric, Sewer, Water Line included
Completed in record time
Support: 12 months after handover
Completion Time - 9 months
Scope: Structure Work, Paint, Tiles